MFA Program, 205 Hudson Street: Gallery & Studio Build-Out

Hunter’s new MFA facility at 205 Hudson Street includes a 5,000-square-foot, street-level gallery that is expected to be completed in early 2014. This unique space consists of two levels connected by a stair and lift, as well as a dedicated elevator that links the gallery with the 2nd, 3rd, and 4th floors, where the MFA program resides. A dedicated entrance directly on Canal Street will ensure that this gallery grabs a great deal of attention.

 

205main
Exterior and main entrance at 205 Hudson.
205hudwood
Woodworking studio.
205hudgall
Gallery space, approaching completion.
205hudent
Entrance and main lobby area.
gall2
Gallery construction progress. Completion is expected in March 2014. (This image taken on 1/13/14.)
gall1
Gallery construction progress. Completion is expected in March 2014. (This image taken on 1/13/14.)
gall3
Gallery construction progress. Completion is expected in March 2014. (This image taken on 1/13/14.)
gall4
Gallery construction progress. Completion is expected in March 2014. (This image taken on 1/13/14.)
205.0
View of ground-level gallery space looking south from entrance.
205.1
Wall being constructed to separate the 1st and 2nd levels -- looking southwest from the gallery entrance.
205.2
View looking northeast toward Canal Street, where the main entrance will be located.
205.3
View of the primary display area in the upper level of the gallery.
205.5
Main gallery space, looking southward, viewed from loading entrance.
205.6
View from loading entrance, looking east toward main gallery space.

Pictured below:  Gallery framing work (click on images to enlarge)

 

205.7
205.8
205.9
Document Actions

Peak Load Management Days: What You Need To Know
Peak Load

The announcement shown above will be visible on public monitors and displayed in various other places around campus on especially hot summer days--Peak Load Management days.  To learn more, click HERE and HERE and on the image above.

 
Facilities Management & Planning website feedback:
North Building Room C0062
(212) 772-4422 | email us
HUNTER COLLEGE
695 Park Ave
NY, NY 10065
212.772.4000