Lecture Hall 714 West

As one of the largest and most intensively-used spaces on Hunter's campus, this lecture hall recently received the well-deserved makeover that it has long awaited. It underwent an extensive, dual-phase renovation. The first phase took place over several weeks during the summer of 2014. During this phase, the hall received lighting and aesthetic upgrades, a state-of-the-art audio-visual system, sound-damping, fire safety work, and replacement of doors and door hardware. The second phase of this renovation included installation of new flooring and complete replacement of its auditorium-style seating, and was completed in time for students to enjoy the improvements on their first day of Spring semester 2015 classes.

 

firstclass1
firstclass2

Shown above -- Phase 2 work:  The job is completed in time for the first day of classes--Spring semester 2015.  Click on images to enlarge.

seatsin1
seatsin2
seatsin3
seatsin4
seatsin5

Shown above -- Phase 2 work:  And the seats are in!  Click on images to enlarge.

access1
access2
access3

Shown above -- Phase 2 work:  ADA-accessible space being built.  Click on images to enlarge.

aisle1
aisle2

Shown above -- Phase 2 work:  Aisle carpet is in.  Click on images to enlarge.

carpetframes1
carpetframes2
carpetframes3
carpetframes4

Shown above -- Phase 2 work:  New seating frames are installed; new carpeting is installed.  Click on images to enlarge.

seatsgone1
seatsgone2
seatsgone3
seatsgone4
seatsgone5
seatsgone6

Shown above -- Phase 2 work:  Old seating is removed; the floor is stripped.  Click on images to enlarge.

Shown above:  Phase 1 is complete---first day of fall 2014 classes.  (As of 8/28/14.)

Shown above:  Overhead lighting nearly complete; new audio-visual system being tested.  (As of 8/27/14.)

Shown above:  Overhead lighting being installed; residual patching and painting.  (As of 8/26/14.)

Shown above:  The ceiling is sealed, the sound damping has been mounted, and overhead lighting is being installed.  (As of 8/25/14.)

Shown above:  Overhead lighting and internal wiring continue; installation of the new audio-visual system components.  (As of 8/20/14.)

Shown above:  Overhead lighting and internal wiring work continue.  (As of 8/18/14.)

Shown above:  Prep work for overhead lighting and internal wiring.  (As of 8/12/14.)

Document Actions


CLICK ON THE MAP ABOVE TO EXPLORE OUR CAMPUSES & BUILDINGS AND TO GET DIRECTIONS

 
Facilities Management & Planning website feedback:
North Building Room C0062
(212) 772-4422 | email us
HUNTER COLLEGE
695 Park Ave
NY, NY 10065
212.772.4000