Construction Schedule

  • Excavation/Foundation: 2015 – 2016
  • Structure: 2016 – 2017
  • Interior: 2017 – 2018
  • Target Occupancy Date: 2019

Hours

Construction work hours at the site are typically Monday to Friday, 7:00 am to 6:00 pm, in accordance with permits issued by the NYC Department of Buildings. Noise levels are kept within the limits of the NYC Noise Control Code, and are minimized as much as possible. Some Saturday work will occur from 7:00 am to 6:00 pm, also in accordance with permits issued by the NYC Department of Buildings.

The construction manager for the site, Turner Construction Company, may on occasion apply to the NYC Department of Buildings for permission to begin work on weekdays at 6:00 am. The DOB considers our extended hours permit requests on a week-by-week basis. If and when these requests are approved, we will strive to limit the number of days when work begins before 7:00 am, only using the extra hour when safety or other practical concerns make it a necessity. As always, any changes to permitted hours of work at the project site will be communicated to area residents and posted online.

 

Document Actions

Memorial Sloan-Kettering
communityaffairs@mskcc.org
212-639-4444

CUNY/Hunter College
external@hunter.cuny.edu
212-396-6813

  • Location: East 74th Street between York Avenue and FDR Drive
  • Lot Size: 66,111 square feet
  • Building Size: 1,150,000 gross square feet (750,000 for Memorial Sloan-Kettering and 403,000 for CUNY)
 
Hunter College Science and Health Professions Building website feedback:
(212) 396 - 6813 | email us
HUNTER COLLEGE
695 Park Ave
NY, NY 10065
212.772.4000